breadcrumbNavigation
Architecture
Zentralstellwerk SBB
Zentralstellwerk SBB,Â
Münchensteinerstrasse 115, 4052 Basel
The Central Signal Box boasts an extraordinary location, set between the train tracks at the point where the road crosses the railway.
Description
The striking monolith was built from designs by Basel architects Herzog & de Meuron and completed in 1999. Visitors arriving at Basel SBB station can spot the copper-coloured cladding from afar.
Contact
Address
Zentralstellwerk SBB
Münchensteinerstrasse 115
4052 Basel
All rights reserved